My motivation for getting the house repairs completed has been given an adrenaline shot.

7-19-2012:

  • Finished tiling master bathroom tub surround & floor
  • Grouted master bathroom tile & floor

7/20/2012

  • Removed about 3/4 of the 2-layers of linoleum flooring in the kitchen
  • Scraped adhesive to bare concrete floor

7/22/2012

  • Removed all wallpaper and paper backer from kitchen
  • Removed all cabinet doors from kitchen
  • Scraped popcorn from kitchen ceiling to repair settling cracks in drywall
  • Removed fluorescent light cover & grid to repair (will repair later on – maybe next week)
  • Found supplier for replacement hinges and door/drawer pulls for all cabinets through the house
  • Found local tub re-finisher for re-surfacing the kids’ bathtub

7/23/2012

  • Removed all hinges and screws from the cabinet doors and drawers
  • Boxed and removed all kitchen items left in the kitchen drawers & cabinets
  • Removed backsplash and counter tops along south wall of kitchen
  • Sealed grout in master bath with 2 coats of grout sealant
  • Tape & bed ceiling settling cracks in kitchen
  • Primer (Kilz) walls that were wallpapered – to texture afterwards
  • Contacted contractor to get pricing for replacement carpet in bedrooms and closets
  • Repaired can-light over kitchen sink

That said… I’m tired.  It will be a long night finishing up today’s tasks – then tomorrow begins the work again.