My motivation for getting the house repairs completed has been given an adrenaline shot.
7-19-2012:
- Finished tiling master bathroom tub surround & floor
- Grouted master bathroom tile & floor
7/20/2012
- Removed about 3/4 of the 2-layers of linoleum flooring in the kitchen
- Scraped adhesive to bare concrete floor
7/22/2012
- Removed all wallpaper and paper backer from kitchen
- Removed all cabinet doors from kitchen
- Scraped popcorn from kitchen ceiling to repair settling cracks in drywall
- Removed fluorescent light cover & grid to repair (will repair later on – maybe next week)
- Found supplier for replacement hinges and door/drawer pulls for all cabinets through the house
- Found local tub re-finisher for re-surfacing the kids’ bathtub
7/23/2012
- Removed all hinges and screws from the cabinet doors and drawers
- Boxed and removed all kitchen items left in the kitchen drawers & cabinets
- Removed backsplash and counter tops along south wall of kitchen
- Sealed grout in master bath with 2 coats of grout sealant
- Tape & bed ceiling settling cracks in kitchen
- Primer (Kilz) walls that were wallpapered – to texture afterwards
- Contacted contractor to get pricing for replacement carpet in bedrooms and closets
- Repaired can-light over kitchen sink
That said… I’m tired. It will be a long night finishing up today’s tasks – then tomorrow begins the work again.