Another update for the work on the house:
7/25/2012
- Removed kitchen sink and countertop and back-splash
- Removed rotten wood (36+ years old home with particle-board cabinets that had gotten wet)
- Ordered cabinet hardware (hinges and pulls)
- Replaced all rotten wood on the cabinets
- Repaired my compressor
- Repaired water line after shooting a nail through it (don’t ask! I measured 2x for stud spacing!)
7/26/2012
- Finished replacing all cabinet wood that required it
- Started scraping cabinets of old paint
Only 6pm, and more painting prep to go for the evening.
Leave a Reply
You must be logged in to post a comment.